Can you live at home during renovation work?

Updated 19 September 2026 · Project preparation

Discuss your project

Remaining at home is practical only when access, sanitation, cooking and separation from the work area are adequately arranged. Assess those conditions for each phase. Being able to enter the house in the evening does not automatically mean it remains suitable for everyday living.

Which daily household functions must remain available?

List the functions you need every day: sleeping, washing, cooking, working and reaching the front door. Mark them on a plan beside the construction area. A kitchen renovation may also affect access to the garden or electrical cupboard. Ask which functions remain available during each phase.

Mention circumstances such as children, pets or shift work. This supports practical arrangements without assuming every household can tolerate the same disruption. A room name alone does not explain how frequently the space is used or why it matters.

How do you separate living and construction?

Agree where materials are stored and which routes belong to contractors and occupants. Discuss protection for floors and furniture, and how dust may move between rooms. Temporary separation must be considered alongside the actual work and access requirements.

Ask the contractor to explain when a space must not be entered. Do not alter temporary supports or barriers yourself to create a shortcut through the house. Request a suitable route within the agreed site arrangement instead, especially when work zones change during construction.

Which temporary facilities should be agreed?

A temporary kitchen involves more than putting an appliance on a table. Discuss suitable connections, water, waste and food preparation space. For bathroom work, consider toilet access and washing facilities separately. Record who supplies, connects, uses and removes temporary equipment.

A general promise that you can stay at home does not define this scope. Also establish when services may be interrupted and how notice will be given. The chosen arrangement needs to match the technical possibilities and remaining usable space in the property.

When does moving out become the practical option?

Some combinations of work leave very little usable living space. Discuss a fallback before construction starts. Connect that decision to specific conditions, such as losing essential facilities or needing to close a work zone, rather than discomfort alone. Allow for the existing building differing from expectations.

Moving elsewhere temporarily may affect the programme and storage arrangements. Record those consequences so a practical change does not silently replace other agreements about access, protection or responsibility. Review the arrangement when the work sequence changes materially.

Frequently asked questions

Can a family always stay home during an extension?

No. Connecting the extension and carrying out internal work can restrict daily use. Check the rooms and facilities available in each phase, and discuss an alternative where essential household functions cannot be maintained.

Who supplies a temporary kitchen?

That depends on the agreed scope. Specify supply, connections, use and removal separately. Do not assume a temporary kitchen is automatically included in an extension quotation or a kitchen installation package.

Does all furniture need to leave the house?

That depends on work zones, material transport and protection requirements. Review each room. Agree what can remain, what needs protection and where displaced belongings can be stored without blocking access or the work.

Plan your project

Bring your decisions and outstanding questions into a practical project brief.

Discuss your project

Tell us about your home.

You do not need a finished design. A clear idea is a useful starting point.

06 40062896

Jongma Development · Hoofddorp · Chamber of Commerce 91401216

WhatsApp