A services layout records intended routes and connection points for building services. Depending on the project, it may cover several installations. The drawing should correspond to the current room arrangement and actual selected equipment.
How this term relates to your project
When a kitchen moves, water, drainage, electricity and ventilation are not independent preferences. Their routes may share the same floor, wall or cupboard. Identify who combines supplier information and incorporates changes. An old kitchen layout can produce incorrect connections if it remains in circulation after a revision.
Date and number the current plan and identify provisional measurements. After installation, retain relevant information about concealed routes. Update records where execution differs from the proposal so the building file describes more than the original intention. This is useful when equipment is replaced or later work requires opening a finished wall or floor.